Nellis Auction Logo
Explore Productsended

WADYDZMFCF 812-0261 Pellet Stove Control Box Circuit Board, Fit for Quadra-Fire 800 nova, 1000, & 1100i Control Box?Replaces Old Part 230-0120

Photo 1 of WADYDZMFCF 812-0261 Pellet Stove Control Box Circuit Board, Fit for Quadra-Fire 800 nova, 1000, & 1100i Control Box?Replaces Old Part 230-0120
1/3
Photo 1 of WADYDZMFCF 812-0261 Pellet Stove Control Box Circuit Board, Fit for Quadra-Fire 800 nova, 1000, & 1100i Control Box?Replaces Old Part 230-0120
2/3
Photo 1 of WADYDZMFCF 812-0261 Pellet Stove Control Box Circuit Board, Fit for Quadra-Fire 800 nova, 1000, & 1100i Control Box?Replaces Old Part 230-0120
3/3

Ended

-

Won For

$17

Item Details

Seller

Operator Logo

Nellis Auction

Pickup Location

4031 Market Center Dr Suite 303

North Las Vegas, NV, 89030

Quality

New
Functional
No Damage
No Assembly Needed
In Package
No Missing Parts

Estimated Retail Price

$286.41

Buyers Premium

15%

Inventory Number

1052231062

Additional Details from the Manufacturer

This item information is coming from the manufacturer. Some of the details may vary from the Nellis Auction listing. Please check the Quality Rating and Notes for information specific to this listing

brand

WADYDZMFCF

color

Black

More features

  • Compatible Models: 812-0261 pellet stove control box is a replacement, which replaces old part 230-0120. Fit for Quadra-Fire pellet stove models: 800 Nova / 1000/ 1100i pellet stove. It can perfectly repair your pellet stove
  • Precise Control: Pellet Stove Control Box Circuit Board can control the operation of igniter, feed motor, conversion blower, and combustion blower through temperature sensors. To provide better combustion performance
  • Reliable Quality: 1100i Pellet Stove Control Box Circuit Board fit for Quadra-Fire is made of high-quality materials. Each control box undergoes strict tests—airtightness, durability, high-temperature resistance to guarantee reliability and safety in every use
  • Easy Installation: Control Box Circuit Board fit for Quadra-Fire is easy to install. Step one: turn off the main power to the furnace. Step two: take photos of the old circuit board's wiring, remove the old box. Step three: connect the new box according to the photos
  • Recommendation: We recommend a surge protector of at least 1000 joules be in place between the stoves wall cord and the wall outlet to prevent surges, strikes, and spikes. Please ensure you require a control board prior to ordering; any questions please contact us
Explore page screenshot

See the deals

Get in on the action, thousands of new items added daily. Bid and win!

Start bidding now